Edgett Williams' full range of services covers every phase of a project's life cycle.

.

During the concept development phase of a new building, EDGETT WILLIAMS generates analyses of various building massing schemes, which allow for quick comparisons of transportation system performance, core configurations, and budgets.    These analyses often incorporate unique core designs, equipment configurations, and system features tailored to specific project needs Analyses are performed using proprietary system traffic analysis software, developed over the last ten years. 

The standards, methods and calculations are based on experience with landmark projects around the world, and performance data compiled from major equipment manufacturers. EDGETT WILLIAMS can also assist owners to devise design guidelines for their projects. These can include assumptions for occupancy and population, as well as standards for traffic handling performance, car sizes, speeds, layout, equipment spaces and location. Special considerations such as accessibility, parking and interface with security and life safety systems can be included as well.

 

.

During schematic design, EDGETT WILLIAMS produces general equipment layout arrangements to match the building scheme or schemes under consideration. Once a configuration is chosen, layouts of equipment and machine room spaces are generated. Layouts include design data for related structural, mechanical and electrical systems, compiled from major manufacturers’ published literature, applicable to the project location. Customized equipment and configurations are proposed where required to overcome unique space requirements or limitations, and these are accompanied by estimates for additional costs which may impact the project budget.



Layouts and design data are provided for coordination with other design disciplines. To assist the architect and minimize potential problems during installation and the coordination of related work, EDGETT WILLIAMS reviews and marks-up architectural drawings.  EDGETT WILLIAMS layouts are produced in AutoCAD, allowing for fast integration directly into architectural drawings.

.

EDGETT WILLIAMS produces comprehensive specifications of the selected building transportation system for use in competitive bidding. EDGETT WILLIAMS has extensive experience with the different codes, performance standards, and manufacturer products in different countries, and draws on this experience when preparing specifications.

The specifications produced are generic and performance oriented, to ensure the best pricing and products are offered by qualified manufacturers. Specifications are produced in standard CSI Division 14 format, or in a format compatible with the client’s project design manual, and include reference to codes and standards applicable to the facility being designed. Specifications can be provided in WordPerfect, MS-Word or Ami-Pro, for direct incorporation into project manuals.

.

Bid documents are assembled rapidly after approval of the design, and include any special owner requirements in the bid instructions. EDGETT WILLIAMS facilitates the bid process by communicating project scope and requirements to qualified manufacturers, and if appropriate, encourages manufacturers to submit approaches which can decrease project cost or completion time. Maintenance pricing is obtained at the time of the new equipment tender, so long term operating costs are included in the economic evaluation of the tender. Equipment performance specifications are typically included in maintenance agreements, to ensure that original equipment performance levels are maintained.


Manufacturer's proposals are analyzed for conformance with tender documents and project objectives. This analysis includes a review of pricing, equipment, service, as well as organization and project management plan. EDGETT WILLIAMS coordinates any necessary follow-up presentations, site visits, and the development of project installation and management plans with the equipment manufacturer.

.

To minimize end-of-project punch list items, and ensure that the final installation is consistent with architect and owner requirements, EDGETT WILLIAMS reviews shop drawings and submittals from the selected manufacturer. This review is coordinated through the architect with other building disciplines, to prevent construction and occupancy delays, caused by time consuming disputes, arbitration, and deficiency correction.

.
EDGETT WILLIAMS monitors installation progress on-site, and provides accompanying field observation and percentage completion reports. This includes reviewing schedules, progress payments, change orders, and acceptance forms to ensure work has been correctly performed. When the installation is complete, it is reviewed for operational and architectural compliance with contract documents, and system completion tests are observed. A punch list outlining any deficiencies is produced. 


Documents for final completion, contract close-out, and warranty are reviewed. To facilitate a smooth transition from construction to operation for new projects, EDGETT WILLIAMS assists with training building personnel to monitor system performance and maintenance.

.
EDGETT WILLIAMS evaluates building transportation system condition, operation and maintenance at existing properties. System performance is compared to standards appropriate for the equipment and building type. Records of elevator maintenance, repair, callbacks, shutdowns and entrapments are reviewed. Deficiencies in maintenance and performance are noted. The existing maintenance agreement is reviewed with respect to contract coverage, performance standards, pricing and terms. 


Custom agreement language can be drafted based on owner and building requirements. A corrective action plan are developed and implemented with building management and the elevator maintenance contractor. For bidding maintenance services, EDGETT WILLIAMS identifies qualified bidders, evaluates maintenance bids, assists with negotiations, and provides recommendations for award.

.
EDGETT WILLIAMS reviews existing installations with regard to applicable local, state and federal codes and requirements, including the Americans with Disabilities Act. Accessibility features observed include visual and audible signals, buttons, tactile markings, emergency communications and door systems. 

EDGETT WILLIAMS has evaluated building transportation systems as part of due diligence investigations for major properties throughout the US. Due diligence reports include an inventory of existing equipment by type and duty, a review of equipment performance and condition, and recommendations for maintenance, equipment upgrade and corresponding budget estimates.


.

Over time, changes in building use, occupancy, tenant mix, codes, and technology, combined with system deterioration and unsympathetic modifications, may make a once satisfactory system less than acceptable. Based on a review of existing systems, and client interviews to gain an understanding of owner objectives, EDGETT WILLIAMS formulates practical recommendations for modernization which can improve system and building efficiency. An appropriate modernization specification is then prepared for competitive bidding. Once a modernization program has been selected, EDGETT WILLIAMS works with building management and the equipment contractor to formulate a modernization installation plan to minimize downtime and inconvenience to tenants. Where appropriate, changes in building operating procedures are suggested as well.


..

EDGETT WILLIAMS has developed innovative building transportation software applications for traffic analysis, building design, equipment/maintenance management and project/client management. EDGETT WILLIAMS is pursuing opportunities using the Internet, relational databases, visual simulation, and CAD, and can assist clients in these areas.

HOME PAGE  |  VIEW PAGE IN FRAMES